— Products / Stairs and handrails

Stairs and handrails — delivered and installed

We deliver finished stairs, landings, stair treads and handrails in glass-fibre reinforced composite (GRP/FRP) — from advice and dimensioning to installation on site. Everything is bolted together without welding, and the material does not rust, so there is no zinc layer or paint to keep up.

Scope
Advice to installation
Handrail
DIN EN ISO 14122-3
Assembly
Bolted, no welding
— Solutions

Three typical jobs

New stairs, and new treads on old ones
GRP stair treads with contrast nosing
— 01 / Stairs and treads

New stairs, and new treads on old ones

We deliver stringer stairs with grating landings, and we fit anti-slip treads with a contrast nosing on top of existing concrete or steel steps. Slip resistance depends on the chosen surface and the use — we select it according to whether the stair is wet, outdoors or in a process environment. An existing stair can often be renovated flight by flight while it stays in use.

  • Anti-slip tread surface with contrast nosing
  • Tread covers on top of existing steps
  • Free-draining grating landings
Surface
Anti-slip
Nosing
Contrast colour
Assembly
Bolted
Stairs up embankments and slopes
Embankment stair in glass-fibre composite
— 02 / Embankment stairs

Stairs up embankments and slopes

On a slope without crane access, weight decides. GRP is significantly lighter than steel, so stringers, treads and landings can be carried up in sections and assembled on site. Where suitable, the feet can sit on Krinner screw foundations instead of cast footings.

  • Sections carried up without a crane
  • Krinner screw foundations Ø 76–220 mm where the ground allows
  • Electrically insulating — relevant close to track
Weight
Significantly lighter than steel
Foundation
Ø 76–220 mm
Electrical
Insulating
Handrails with top rail, knee rail and toe board
Bolted GRP handrail
— 03 / Handrails

Handrails with top rail, knee rail and toe board

The handrail system is dimensioned to DIN EN ISO 14122-3 from post spacing, section and fixing in the specific project. It is assembled with bolts and brackets, so there is no welding and no hot-work permit, and a shortened post needs no aftertreatment the way steel does.

  • Posts, top rail, knee rail and toe board in one system
  • No welding and no hot work
  • The top rail feels less cold than steel in winter
Standard
DIN EN ISO 14122-3
Assembly
Bolted
Maintenance
Very little
— How we work

From survey to finished stair

  1. 01

    Dialogue and advice

    We look at the access route, its use and the environment with you.

  2. 02

    Design and dimensioning

    We survey and dimension stair and handrail for load and geometry.

  3. 03

    Fabrication and preparation

    Treads, stringers and handrail parts are cut and drilled in our workshop.

  4. 04

    Delivery and installation

    We deliver and install ourselves, preferably while the site stays in operation.

— Frequently asked

What we are asked most often

Does the handrail meet DIN EN ISO 14122-3?

It is dimensioned to the standard. Capacity depends on post spacing, profile section and fixing, so we calculate the specific geometry and load and state post spacing and fixing together with the quotation.

Can an existing steel stair get new GRP treads?

Yes, in many cases we can fit new GRP treads to the existing steel stringers. During the survey we assess the condition of the stringers and the spacing between the treads, and on that basis we choose the fixing that suits the stair.

— Next step

Got a project? Let us take a look.

Send a short description, a drawing or the tender documents. We come back with a no-obligation proposal for the solution, installation and price.

Talk to an adviser
AddressIndustrivej 4, 6622 Bække
Opening hoursMon – Fri · 08:00 – 16:00