
A new deck on an existing bridge
A GRP deck is significantly lighter than an equivalent steel deck, so the load on the existing girders typically drops. Whether the structure needs to be checked is assessed in the specific project from load, span and bearing structure. Panels are fabricated to size in our workshop and bolted in place without welding.
- Grating or planks chosen for load and use
- Bolted assembly — no hot work over traffic or water
- Resists de-icing salt and needs very little maintenance
- Weight
- Significantly lighter than steel
- Assembly
- Bolted
- Surface
- Anti-slip

