— Products / Platforms

Platforms installed in a short window

Platform edges, work platforms and service podiums in glass-fibre reinforced composite (GRP/FRP) — designed, fabricated and installed by us. Because the parts are prepared to size and bolted together, installation can typically be planned within a track possession or a shutdown.

Scope
Advice to installation
Handrail
DIN EN ISO 14122-3
Assembly
Bolted, no welding
— Solutions

Three typical platforms

Railway platform edges and build-ups
Platform edge in glass-fibre composite
— 01 / Platform edges

Railway platform edges and build-ups

Grating and planks are laid on a load-bearing frame of pultruded profiles and bolted down. The material is electrically insulating, which is an advantage close to track and overhead lines. Grating drains so water does not stand on the edge; the specific slip resistance is chosen by product and use.

  • Grating in 30×30 or 38×38 mm mesh by load
  • Planks in 150–300 mm where the edge must be closed
  • Electrically insulating material
Mesh
30×30 / 38×38 mm
Electrical
Insulating
Assembly
Bolted
Landings and work decks in process plants
Work deck in a process environment
— 02 / Work platforms

Landings and work decks in process plants

Around pumps, tanks and filters the walkway sits in moisture, condensate and chemicals. GRP does not rust and needs very little maintenance; chemical resistance depends on the specific environment and is assessed in the project. Grating panels can be lifted off by hand for inspection.

  • Load-bearing frame in U, I, box and angle profiles
  • Cut-outs for pipes and penetrations made to size
  • Removable grating panels for inspection
Profiles
U · I · box · angle
Environment
Moisture and chemicals
Maintenance
Very little
Podiums at masts, signals and equipment
Service podium at a mast
— 03 / Service podiums

Podiums at masts, signals and equipment

A service podium has to go up with parts a fitter can handle. The parts are significantly lighter than steel, bolt together and need no welding close to overhead lines and signal cables. Where suitable, the podium can be founded on Krinner screw foundations.

  • Podium deck in grating with an anti-slip surface
  • Handrail to DIN EN ISO 14122-3
  • Krinner screw foundations Ø 76–220 mm where the ground allows
Handrail
DIN EN ISO 14122-3
Weight
Significantly lighter than steel
Foundation
Ø 76–220 mm
— How we work

Planned around the work window

  1. 01

    Dialogue and advice

    We clarify use, load and the work window available.

  2. 02

    Design and dimensioning

    Frame and deck are dimensioned for load, span and deflection.

  3. 03

    Fabrication and preparation

    Parts are cut and drilled to size so time on site is short.

  4. 04

    Delivery and installation

    We deliver and install ourselves within the possession or shutdown.

— Frequently asked

What we are asked most often

What decides profile depth and span?

Often deflection rather than ultimate strength, because GRP is less stiff than steel. We dimension from imposed load and span and state the calculated deflection with the quotation.

Can the platform be dismantled and reused?

The structure is bolted, so as a rule it can be dismantled and moved. How much can be reused depends on the condition of the parts and the new job.

— Next step

Got a project? Let us take a look.

Send a short description, a drawing or the tender documents. We come back with a no-obligation proposal for the solution, installation and price.

Talk to an adviser
AddressIndustrivej 4, 6622 Bække
Opening hoursMon – Fri · 08:00 – 16:00